Consortium led by Iskra to build Dubrovnik's wastewater treatment system | Iskra B2B Shop

Consortium led by Iskra to build Dubrovnik's wastewater treatment system

24. 10. 2024

The Slovenian-Croatian consortium led by Iskra, which includes the Slovenian company Hidroinženiring, Dubrovnik-based firm Alfaplan, and Split’s Elmap, has been selected as the contractor for a key segment of the "Development of Water and Wastewater Infrastructure in Dubrovnik" project.

The consortium will construct the Lapad wastewater treatment facility, including an underwater discharge system.

The project involves building a secondary treatment wastewater facility with three main technological units: mechanical treatment, biological treatment, and sludge processing. The contractors will construct a new facility equipped with advanced systems, including coarse and fine grates, an aerated grit chamber, grease traps, and a membrane bioreactor. Additionally, a sludge treatment facility, a hydraulic tunnel approximately 350 meters long, and an 835-meter-long underwater discharge system will be installed.

"This is a vital step for Dubrovnik, a city that has long deserved a comprehensive water and wastewater infrastructure to significantly enhance environmental protection and manage wastewater effectively," said Lukša Matušić, Director of Vodovod Dubrovnik. "Congratulations to the Slovenian companies selected for this project. We look forward to successful collaboration."

"We are pleased that the synergy between Iskra, Hidroinženiring, and our Croatian partners—Dubrovnik’s Alfaplan and Split’s Elmap, in which we acquired a majority stake earlier this year—was recognized through this tender," said Mr. Dušan Šešok. "The selection process was lengthy and thorough, but we met all high standards necessary for the construction of the treatment plant and sludge facility. Our partnership with Vodovod Dubrovnik represents a critical step forward, and we are excited that the new treatment plant will soon become an integral part of life for the people of Dubrovnik and their guests. Iskra has major ambitions in the water treatment sector, and this strategic project in Dubrovnik is essential for showcasing our group's commitment to timely and technically advanced project delivery."

In February this year, Iskra, a provider of electrical and systems solutions based in Ljubljana, acquired a majority stake in Elmap from Split. Elmap is one of the leading companies in the region, specializing in automation solutions for wastewater and drinking water treatment plants, water supply systems, electric power, and infrastructure across various industries, from metallurgy and shipbuilding to pharmaceuticals, petrochemicals, renewable energy, and the oil industry.

The Dubrovnik wastewater treatment plant is designed to serve the long-term needs of the population and economy. Its planned capacity of 73,000 population equivalents (PE) considers future development and growth in tourism through to 2050. Dubrovnik’s Mayor, Mato Franković, noted that "Today marks a historic milestone in the realization of the Dubrovnik Agglomeration project."

The project includes 40,256 meters of pipeline construction, reconstruction, and repair, enhancing water quality access for 78,716 consumers. The wastewater system expansion will cover 30,798 meters, adding 4,409 new users and increasing Dubrovnik’s wastewater coverage to 92 percent. Additionally, the initiative will feature the construction of the Ombla Drinking Water Treatment Plant and the Lapad Wastewater Treatment Plant.

Consortium led by Iskra to build Dubrovnik's wastewater treatment system

Open Day at Iskra: Connecting People, Work and Career Opportunities

20. 06. 2026

Iskra opened its doors to visitors as part of our Open Day event. The event brought together people who wanted to learn more about our company, our work environment, our teams and the career opportunities currently available at Iskra.

From Classroom to Shipyard: Connecting Education and Industry at 3. MAJ Shipyard

17. 06. 2026

3. MAJ Shipyard welcomed students and professors from FH Oberösterreich – University of Applied Sciences Upper Austria, School of Business and Management as part of their field study visit to Croatia.

70 Years of Battery Production Tradition in Šentvid pri Stični

10. 06. 2026

A journey that began 40 years ago and became part of a much larger story. On June 10, 1986, Jože Rus walked through the doors of ZMAJ for his first working day. What started as the beginning of a professional career would grow into a remarkable journey spanning four decades of dedication, innovation, and development in battery production.

Team Spirit Beyond the Workplace: Iskra Joins Tek trojk – Pot ob žici 2026

09. 05. 2026

On 9 May, members of the Iskra team took part in the traditional Tek trojk – Pot ob žici 2026 event in Ljubljana, one of Slovenia’s most meaningful sports and recreational gatherings, bringing together movement, remembrance, community and team spirit.

A New Chapter Begins for 3. Maj Shipyard Rijeka

12. 03. 2026

3. Maj Shipyard is entering a new chapter as part of Iskra Group — combining decades of shipbuilding heritage with a forward-looking vision focused on innovation, industrial excellence, and long-term development.

POWER CONNECT'26: Strengthening Partnerships Across the Balkan Region

01. 03. 2026

On February 25, Iskra proudly hosted POWER CONNECT 2026 at our Laktaši facility, welcoming valued distributors from across the Balkan region for a full-day partner event dedicated to collaboration, innovation, and strategic growth.

ISKRA Successfully Extends ISO 9001:2015 and ISO 14001:2015 Certifications

13. 02. 2026

Proud to announce the successful extension of its ISO 9001:2015 and ISO 14001:2015 certifications following a comprehensive assessment conducted by SGS, the world’s leading inspection, verification, testing and certification company.

From Slovenia to Turkey: Iskra Advancing Railway Infrastructure Across Borders

10. 01. 2026

January has marked strong operational momentum for Iskra’s railway teams, with parallel project activities underway in both Slovenia and Turkey.

Iskra Shipyard signs €30M+ hybrid floating dock contract, strengthening Adriatic ship repair capability

14. 11. 2025

Iskra Shipyard has signed a €30+ million contract to build a 115-meter hybrid floating dock—the largest single investment in its history. With a 4,000-ton lifting capacity, the new dock will expand its ability to service everything from large ferries to superyachts.

ELKA is The Most Successful Large Company in Croatia for 2024

08. 10. 2025

We at Iskra Group are proud to announce that our company ELKA d.o.o. Zagreb has been awarded the Zlatna Kuna for the most successful large company in Croatia for 2024.

Experio d.o.o. joins the Iskra Group

07. 10. 2025

We are pleased to announce that eXperio d.o.o., a Croatian company from Slavonski Brod specializing in industrial machinery and advanced manufacturing technologies, has officially joined the Iskra Group.

First two SAR15 vessels successfully delivered to Pula and Split

18. 06. 2025

We are proud to announce that the first two SAR15 high-speed aluminum rescue vessels, designed and built by Iskra Shipyard Šibenik, have been officially delivered to the Harbour Master offices in Pula and Split.